Fuzhou Yilida Wood Industry Co., Ltd.
Products
Contact Us
  • Contact Person : Ms. Gong kelly
  • Company Name : Fuzhou Yilida Wood Industry Co., Ltd.
  • Tel : 86-591-15280106683
  • Fax : 86-591-22183269
  • Address : Fujian,Fuzhou,No. 108, Xiaoqiao, Houyu Village, Jingxi Town
  • Country/Region : China
  • Zip : 350100

New design wooden flooring

New design wooden flooring
Product Detailed
Related Categories:Engineered Flooring
wooden flooring 1.With 7 patents 2.Damp-proof,Mould-proof,Crack-proof 3.Formaldehyd leakage resistant 4.Very easy install

Product Name:waterproof and fireproof flooring

Specifications

Item Name

Laminate flooring

Density

0.85-0.94g/cm 3

Formaldehyde Release

E0/E1

Absoring water thickness expansion rate

6-13%

Shock Resistance

7.2-8

Abrasion Resistance

AC3,AC4

Overlay Paper

American MEAD

Fireproofing Grade

B1

Dimensions

1215*144*12mm

Surface

Flat/high gloss

Packing

10pcs/carton,54carton/pallet,20pallet/20’ft container,1750m2/container.

Click

Arc Click,Single Click,Unilin Click

Pictures of exclusive shops

Why Choose Haoge Laminate Flooring?

Haoge Laminate flooring,being trusted for reliable quality,offers expansive colors and designs to meet the personal style of all customers.Our aim is bring value to your life and make life easier.

1.Environment-friendly

E0/E1 substrate protects your health from possible harm caused by excessive emission of formaldehyde in your daily life.

2.Broad choice of tasteful styles

With our colorful designs you can create your own residential style.

3.Stable high quality

Professional manufacture with advanced technology and equipment assures the quality of being reliable.

4.Durability

Resistant to scratches,dents,and dings,moisture and wear-through.Quality raw material is beneficial to the service life of flooring.

5.Easy to install,maintain,care

You can install by yourself if you are handy.Just sweep as needed and map occasionally.

Pictures of Certifications

Product Workshop

Points for attention before installation:

Your subfloor must be clean,flat,firm,and dry.Please do not fix planks to your subfloor with nail or glue.Expansion gap of 8-12mm should be left between planks and walls or other fixed objects.The expansion space should be necessare under the door between tow rooms when the flooring goes through.When connected to damp places such as bath room or kitchen room,it is necessary to take measures to prevent water leaking to flooring.

Installation Procedure

Lay one 2mm-thick high-density polythene foam on the subfloorSeal the tie-in of the polythene adjoining foams closely with wide adhesive tape.Begin with the left side of the room and lay the first full piece with the tongue side of the flooring facing the wall.If the remaining piece from the last plank of previous row is over 300mm,it can be used to start the next row.The last row in the installation may need to be cut lengthwise.

6. During the installation,tap any gap joints together gently when and where necessary with hammer and tapping block.

Pictures of installation

Maintenance guide:

Following proper cares should invite your attention in daily use:

1.Do daily cleaning just with well squeezed wet rag.

2.When moving big or heavy thing,handle with care.Do not pull or push.

3.Do not use strong acid or strong base to clean the floor.

4.Avoid long-time direct contact with high temperature media.

5.To clean oily dirt,just use soft cleaning agent.

6.Do not flush with water.

Pictures after installation

New design wooden flooring



Copyright Notice @ 2008-2022 ECBAY Limited and/or its subsidiaries and licensors. All rights reserved.